See the shift while you can still change it
Manufacturing Execution sits between the plan and the machine. It dispatches orders to the floor, captures what actually happened, and puts OEE, scrap and downtime in front of the supervisor during the shift rather than in next week's report.
The layer that knows what really happened
Your ERP knows what was ordered. Your SCADA knows what the machine did. MES is the layer that reconciles the two: which order ran, on which line, with which material, at what rate, and why it stopped.
That reconciliation is where most plants lose visibility. Without it, downtime reasons are anecdotal, yield is calculated monthly, and a quality problem takes days to trace. With it, the supervisor sees the loss while there is still a shift left to recover it.
- Live OEE with availability, performance and quality broken out
- Downtime captured with a reason code, not a shrug
- Full genealogy from raw material lot to finished pallet
Built for the people on the line
Terminal screens an operator can use with gloves on, and analytics a plant manager can defend in a board meeting.
Production orders released to the right line in the right order, with changeover time and material availability respected.
Availability, performance and quality calculated continuously, with the top losses ranked for the shift meeting.
Every batch linked to its inputs, equipment, parameters and operators. A recall becomes a query, not an investigation.
In-process checks, statistical control charts and enforced holds that stop suspect material moving downstream.
Direct machine connectivity through OPC UA, Modbus and vendor protocols, including older controllers still doing real work.
Large-touch interfaces with the current job, the standard, the checks due and one tap to declare a stoppage reason.
What the floor notices first
Micro-stops and speed losses are usually the largest hidden cost in a plant. Once they are measured, they are finally arguable.
Sequenced orders and prepared materials cut changeover time, which on a constrained line converts directly into output.
In-process gates stop defects travelling. Scrap falls, and the rework that used to absorb a shift disappears from the plan.
Complete genealogy narrows a recall to the affected lots, which protects both the customer relationship and the margin.
Shift logs, check sheets and counts are captured once, at the machine. Nobody transcribes a clipboard into a spreadsheet at 6am.
Actual cycle times replace standards that were set years ago, so the schedule the plant receives is one it can achieve.
Why teams choose us for MES
MES lives or dies on the machine interface and on operator trust. We spend our first weeks on the floor for exactly that reason.
- Connectivity to mixed-vintage equipment, including undocumented controllers
- Reason codes and standards written with your supervisors
- One pilot line live before the estate-wide rollout begins
- Runs on premise so the floor keeps working if the link drops
Ready to see your operation clearly?
Tell us where it hurts. We will come back with an honest read on whether software is the answer, and what it would take.